The Bay D'Espoir Hydroelectric Development, built by the Newfoundland and Labrador Power Commission is located on the south coast of Newfoundland near the rural community of Bay d'Espoir. It was the first major hydroelectric project undertaken in Newfoundland. ==History== The hydroelectric potential of this area was known by the early 1920s but its development was not seriously considered until 1954 when British Newfoundland Development Corporation (BRINCO) became interested in the site. In 1957 a Shawinigan Engineering survey confirmed the feasibility of building a hydroelectric plant. By 1959 BRINCO had set up a subsidiary, Southern Newfoundland Power and Development Corporation, to carry out the project. However, the subsidiary was unable to attract industrial customers to the area; this, it felt, was necessary before undertaking the project, so in 1964 it sold all its rights and assets to the Newfoundland Government. The government, by taking over the project, became eligible for a $20 million grant from the Atlantic Development Board a Federal Government agency. The engineering and construction work was carried out by ShawMont Newfoundland Engineering, a joint venture company formed by Shawinigan Engineering and Montreal Engineering in 1964. The Bay D'Espoir Hydroelectric Development was undertaken to provide the province with a large source of low-cost electric power which would allow the Island's utilities to extend their services, stimulate the expansion of the industries already in the province and attract new industries to Newfoundland and Labrador. The Electric Reduction Company of Canada Industries Limited (ERCO), phosphorus plant at Long Harbour and the Come by Chance Oil Refinery at Come by Chance were built partially because of the availability of cheap power.〔("CHEAP POWER - AN EXPENSIVE FAILURE: HYDRO-ELECTRIC POWER AND INDUSTRIAL DEVELOPMENT IN NEWFOUNDLAND" ) Peter Crabb, 8 JUN 2007〕 Units 1 through 4 went online between 1967 and 1968, with each unit having a rated capacity of 75 MW. Generating unit 2 underwent a major refurbishment during the summer of 2010, including a stator rewind, rotor pole re-insulation and protection upgrade.〔("Hydro investing $52 million in provincial electricity system" ) The Telegram, Published on July 8th, 2010〕 This project was the first stator rewind on a unit of this size in Newfoundland and Labrador Hydro's history.〔("Bay d'Espoir Hydroelectric Generating Station Generating Unit 2 Refurbishment" ) Kevin King, Newfoundland Labrador Hydro〕 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Bay d'Espoir Hydroelectric Power Station」の詳細全文を読む スポンサード リンク
|